Sök:

Sökresultat:

610 Uppsatser om Soil moisture. - Sida 1 av 41

Droppbevattningens inverkan på kvalitet och kvantitet hos Solanum tuberosum L i jämförelse med konventionell spridarebevattning :

A literature study and a field trial have been carried out in order to investigate the physiological response of potato plants to different soil moisture levels. Higher yield, quality and number of tubers can according to the literature be obtained if constant high soil moisture is kept during major parts of the growing season. A field trial was set up where drip irrigation was used as an alternative to conventional irrigation techniques to maintain high and constant Soil moisture. The application of water in the drip irrigated area was monitored and adjusted on a daily basis so that the soil moisture stayed as close as possible to the recommended level. The sprinkle irrigated area was irrigated according to traditional practices with approximately 35 mm every 7th to 10th day depending on the whether.

Elementkoncentrationer i gran utmed en markfuktighetsgradient :

One key factor in silviculture today is sustainability. In order to achieve sustainability it may be important to restore lost nutrients to the forest after clearcutting. In order to calculate the removal, you need to know how much of different elements you will find in different tree compartments. The aim of this study was to investigate if the concentration of elements in different tree compartments of spruce (Picea abies (L.) Karst) were related to the moisture conditions of the site. Five plots at Risfallet (60º 21´ N, 16º 13´ E), was placed along a moisture gradient in a 40- year spruce stand.

Utveckling av en HBV/PULS-model med sammanfogade markfuktighets- och responsrutiner

Soil properties affect the chemical composition of soil water. When studying transport of chemical substances through a basin, it is therefore important to know from which soil layer the main part of the runoff is generated. The aim of this study is to develop an HBV/PULSE model with merged soil moisture and response routines, which generates good approximations of groundwater levels. It should be possible to extend the model to simulate transport of substances and take into account which soil layer the groundwater level is currently in. The hydrological version of HBV/PULSE is used since there is no need to account for pH or alcalinity at this stage.

Jordbearbetningsstrategier på hösten inför vårsådd på tyngre lerjordar :

It is important for today?s farmers to minimize the costs for crop establishment, because of decreased prices and support from the EU. Farmers, who plow in autumn on heavy clay soil, often do some kind of tillage in autumn to get better soil structure before spring seeding. This is especially important when growing small seed crop, e.g. sugar beet and oil plants.

Stöldskydd

To save energy it?s popular to build houses with low energy loss. In these houses the walls are keeping a lower temperature in the external side which leads to a higher relative humidity. In addition more material, such as wood studs, are used which means that there is more moisture to dry. More moisture in combination with higher relative humidity may pose a higher risk of microbial growth.

Olika metoder och tekniska hjälpmedel för att bestämma bevattningstidpunkt :

This examination work on studies and research in articles is mostly from other countries. The purpose of the examination work have been to find out if there are any means you can work with to find out when its time to start irrigation, how they works and if they are credible. In Sweden there is not many means for decide when it?s time to irrigate and how much water you should appear. Swedish farmers think they have so much experience that they don?t need techniques like this.

Att förebygga och undvika fuktskador i byggnader

Efforts to achieve a moisture proof construction process have proved to be considerably complicated, despite the knowledge and awareness that now exists within the moisture field. Materials, documents, templates and checklists are designed to be accessed but are not used anyway. This may be because such effort has not been prioritized and properly requirements have not existed from the commissioner of a building.This report illustrates how the commissioner of a building project can achieve a moisture proof building process by increasing knowledge, moisture proof planning, and implementation of security moisture routines. Proposals are given on how the commissioner of a building project can work to consistently bring a moisture proof building process in all stages. The difficulty with regular moisture proof efforts, the authors believe is mainly due to the following points:      Many different design solutions.      Lack of experience feedback.      Lack of communication.      Financial incentives.      Attitudes.The interviews in the report have conducted with the help of a qualitative analysis, while the survey has been done using a quantitative analytical method.

Fuktomlagringar i välisolerade ytterväggar : En undersökning för att fastställa en rimlig inbyggnadsfuktkvoti träreglar med fuktsimuleringsprogrammet Wufi 2D

To save energy it?s popular to build houses with low energy loss. In these houses the walls are keeping a lower temperature in the external side which leads to a higher relative humidity. In addition more material, such as wood studs, are used which means that there is more moisture to dry. More moisture in combination with higher relative humidity may pose a higher risk of microbial growth.

Den bäcknära zonen vid små skogliga vattendrag i Värmland : generell beskrivning, förekomst av traktorspår samt kvicksilverhalter i körpåverkat ytvatten

Forest streams and the associated riparian zones are sensitive to disturbances and changes that occur within these riparian areas. Particularly sensitive are small streams of low order, which will have large impacts down-stream. The disturbances that occur in the riparian zones are reflected quickly in the stream. Driving with forestry machines in the riparian zone will have detrimental effects to the soil and water. Driving the machines will lead to changes in the mineral soil composition, resulting in the reduction of porosity, less infiltration, compaction, and an increased bulk density.

Anva?ndning av markfuktighetskartor fo?r sta?ndortsanpassad plantering

Digital depth-to-water maps can be produced from a digital elevation model (DEM). Then GIS- based algorithms are used to calculate water flows and the depth-to-water index classes dry, fresh, moist and wet. The purpose of this study was to investigate the possibility to use depth- to-water maps for site adapted planting.The results showed that use of depth-to-water maps for site adapted planting, roughly halved the proportion of improperly planted surfaces from an average of 9 % to 4 %. The variation in the values of proper surface decreased and the result became more even.. In addition, more pine than spruce was incorrectly planted.

Förbättring av U-värde i träkonstruktion för fönster med Aerogel

When constructing a building, a number of aspects must be harmonized in order for it to fulfill requirements ? a building must fulfill requirements such a load-bearing, conservation of energy and a good indoor environment by means of, among other things, moisture proofing .Moisture problems in buildings can affect health negatively. As we are increasingly staying in indoors, demands on a good indoor environment are higher.This work starts with examining moisture problems in slab-on-ground solutions, and then links the various scenarios to moisture problems in a concrete slab of a real building. The building with moisture problems is located in Årby by in Borlänge and moisture damage was found in the slab at an apartment adjoining wall.By reviewing literature written within the field of moisture problem, making hand calculations and modeling in the program Comsol Multiphysics, judgments are made to find explanations as to why the rise of moisture occurred in the building in Årby by.Generally, the following guidelines may be used to reduce the risk of moisture problems in slab-on-ground constructions:Drying of construction moisture before laying the floor material.Using draining layer beneath the slab, to prevent capillary suction.Using insulation under the slab, partly for comfort and to establish the temperature difference between the ground and the concrete slab.Avoid direct contact between the wood and concrete, due to degradation and fouling smells that normally occurs.If necessary, use additional vapor barrier.In addition to the above, there are various methods for moisture-proof and moisture-monitoring by design or by the method ByggaF suited for the entire construction process various events..

Fuktproblematik i platta på mark : En analys av uppkomsten till fuktproblem

When constructing a building, a number of aspects must be harmonized in order for it to fulfill requirements ? a building must fulfill requirements such a load-bearing, conservation of energy and a good indoor environment by means of, among other things, moisture proofing .Moisture problems in buildings can affect health negatively. As we are increasingly staying in indoors, demands on a good indoor environment are higher.This work starts with examining moisture problems in slab-on-ground solutions, and then links the various scenarios to moisture problems in a concrete slab of a real building. The building with moisture problems is located in Årby by in Borlänge and moisture damage was found in the slab at an apartment adjoining wall.By reviewing literature written within the field of moisture problem, making hand calculations and modeling in the program Comsol Multiphysics, judgments are made to find explanations as to why the rise of moisture occurred in the building in Årby by.Generally, the following guidelines may be used to reduce the risk of moisture problems in slab-on-ground constructions:Drying of construction moisture before laying the floor material.Using draining layer beneath the slab, to prevent capillary suction.Using insulation under the slab, partly for comfort and to establish the temperature difference between the ground and the concrete slab.Avoid direct contact between the wood and concrete, due to degradation and fouling smells that normally occurs.If necessary, use additional vapor barrier.In addition to the above, there are various methods for moisture-proof and moisture-monitoring by design or by the method ByggaF suited for the entire construction process various events..

Kvalitetssäkring vid arbete med fukt i virke

There are many factors in a building project that has to collaborate with one another in order to reach the desired end result, how you work with moisture issues in timber is a very important one. While constructing Varbergs Hospital, the building company Skanska came in contact with the issue of extra high demands on the moisture content in timber. What they requested from us was a moisture program in which you clearly could follow the routines regarding work with moisture in timber. The aim is to use this program as a help during the work, in order to achieve a good result.We have developed this study in addition to the moisture program. The aim is that this study will give you a deeper understanding of the important factors to consider.

Fuktskador i ytterväggar på grund av vattenintrång

Moisture damage in buildings is a serious issue that leads to problematic consequences and high economic costs. Despite the knowledge and awareness existing about moisture problems, extensive damager still occurs today. Studies of moisture in the exterior wall constructions shows that the issue if often caused by rain and water intrusion. These kinds of problem result in major costs usually because the companies have to replace the material and structural components and also in some cases tear down large parts of the buildings.The work includes moisture theory and descriptions of four different exterior wall constructions, wood stud wall with plastered facade, exterior wall with wood facade, exterior wall with concrete, and exterior wall with brick facade. Our thesis work describes how the constructions are affected and moisture damage due to water intrusion.

Påverkande faktorer för grotens fukthalt

The aim of this study was to investigate how seasonal variations affect the quality of logging residues. The study was hosted by VIDA Energy. Logging residues can be processed and transported within different systems. Today the dominant systems are chipping at landing and bulk transportation of logging residues. In these systems the handling of the logging residues are carried out in the same manner up to the landings. Moisture content at the time of chipping is the primary quality parameter. Fine fractions of logging residues are strongly dependent on moisture content in storage.

1 Nästa sida ->